Week 39 2026 (Mon Sep 21 - Fri Sep 25, 2026)
Highlights
- We’ve successfully tested the whole feature set for testnet v0.3 under our
provisional deployments, including Windows, Linux, and MacOS versions.
- A draft of our forthcoming RLN preprint is now
available.
- achieved:
- testing
- initial draft of the MixTransport spec (this WIP, will take some time to get it nice and readable)
- preparing for the release
- next:
- working on SPEC
- helping out in fixing potential release problems
- achieved:
- Finished documenting all work related hidden service and path selection: docs
- worked on second iteration on the hidden services spec.
- next:
- prepare research call covering path compromise and selection strategies.
- continue work on the second version of hidden service spec with the path selection spec.
RLN optimizations
- achieved:
- next:
- polish it into a proper preprint
- achieved:
- Applied reviews on PRs opened
- Tested the package download over Storage in Basecamp
- Managed the config in the Storage Module (PR) and applied it in the UI (PR).
- Updated Storage UI to use the
isRunning api provided by the Storage Module (PR).
- Prepared the Storage UI for the advertise option: (PR).
- Added a source icon in the Package Manager UI to display the origin of the downloads: (PR).
- next:
- Test manually in Basecamp