Week 41 2026 (Mon Oct 5 - Sun Oct 11, 2026)
Highlights
We’ve presented a summary of our Mix path-compromise defenses, and finished the second iteration of the hidden-service specification: spec | presentation slides
Our RLN benchmarks can now be parameterized.
achieved:
Presented the path compromise and selection strategies in the research call: slides
Forum post on the research call: post
Finished the second iteration of the hidden service spec .
next:
prepare offsite talk/discussion points on hidden services and path selection specs.
achieved:
implemented parametric benchmarking (to have numbers in the paper)
next:
run the original paper’s benchmarks to be able to compare
check our re-implementations against the paper
clean up the text
achieved:
presets moved to Storage Module: PR and PR
documentation updated: PR
doctests updated to use logosctl: PR
storage folder moved to persistence folder: PR
testing on testnet using Basecamp
next:
update go and rust bindings
add a download cancel button on UI
review the nim-ffi PR on Storage Module
review the libp2p update to 2.4.0
show the storage icon in package manager ui only when the package is available on the storage module network
Misc
Updated libp2p to 2.3.7: PR .