Week 44 2026 (Mon Oct 26 - Sun Nov 1, 2026)

Highlights

  • Pushed out an important fix to our swarm protocol which could cause downloads to stall/fail.

Large Data Transport Layer for Mix

  • achieved:
    • preparing MixTransport PR, low-level Mix API PR
    • new PR #5 - allow the recipient (one of the roles in the MixTransport session) to send the two redundant copies of each reverse Data frame concurrently, enabled by compiling with -d:mixExperimentConcurrentDataCopies. We will most probably make it the default and remove the compile flag - to be confirmed with the team.
    • side activity: mega.dev training. We are experimenting to create a more structured, professional AI workflow for the storage team. In the coming 4 weeks we will be spending some time following a formal AI training addressing this matter deeply.
  • next:

Block Protocol and Mix Transport Optimizations

  • achieved:
  • next:
    • Merge the swarm and validation fixes, and finish the block-exchange adapter metrics and bandwidth-delay-product adjustments discussed in the engineering call.

Logos Core Integration

Misc